Views: 0 Author: Site Editor Publish Time: 2019-08-02 Origin: Site
1. When small-diameter pipes are solvent-bonded, the sockets should be rounded to form a groove, and the fractures should be flat and vertical, so that the joints can be firmly bonded to avoid water leakage.
2. PVC pipes with a diameter of 100 mm or more are generally equipped with a rubber ring. Before installation, personnel must be arranged to chamfer the pipe socket and check whether the quality of the rubber ring is qualified. The socket, apron, etc. must be wiped clean during installation.
3. Pipe trench excavation installed in traditional pipelines only requires the pipe to be placed in the pipe trench and can be sealed. When the original soil layer is not loosened, the cushion can be pressed without pressing.
4. General PVC pipe branch pipe can be used with tee or vertical water stop bolt. During the construction, a saddle-shaped fitting can be added with a half-closed tee and clamped with a U-shaped bolt, so that the wall is thickened, and then the hole is directly drilled on the upper surface, and then the externally threaded plastic piece is used for the extraction.
TOMEEX
https://www.youtube.com/@tomexplumbingsystem2809
https://www.facebook.com/tomex000
https://www.instagram.com/tomex000/
https://www.linkedin.com/company/tommur-industry/
https://www.tiktok.com/@piepe_fittings_tomex